ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2025-04119

at Field Review - Addition / Alteration - #1700 - 17th Floor (elevator lobby) Inerior alterations only to provide upgrades to the existing elevator lobby on the 17th floor (#1700) of this existing commercial building on site. Scope of work: New walls, ceiling, flooring, electrical, mechanical/plumbing and sprinkler work. REVISION #1: Adding ID-103 Schedules & ID-500 Typical Details. - Jan 23/26 - LLL Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Andrew Igel, Architect, AIBC., 778.839.4260\t Electrical Schedule B by Shabnam Shamsolkotabi, P.Eng., 604.609.0500\t Plumbing/Mechanical Schedule B by Riley Mac Neill, P. Eng., 604.609.0500 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · 401 W GEORGIA STREET, Vancouver, BC V6B 5A1 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.