ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2025-01451

at Field Review - Addition / Alteration - 6th floor - elevator lobby Interior alterations to the 6th floor to remove an elevator lobby door, frame and wall to this existing office shell space in this existing commercial building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · 1133 MELVILLE STREET, Vancouver, BC V6E 4E5 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.