at Field Review - Addition / Alteration - 2nd and 6th Floors - (Elevator lobby and corridors) Interior alterations to provide improvements to the lobby area and corridors on the 2nd and 6th floor of this existing commercial building on this site. Scope of work: Remove existing wall finish, flooring, ceiling, millwork, elevator call button, t-bar ceiling. New millwork, electrical and sprinkler work. Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Michael McNaught, Architect, AIBC., 604.724.76020\t\t Electrical Schedule B by Roger Dupuis, P.Eng., 604.569.6500\t Plumbing/Mechanical Schedule B by Joseph Braun, 604.609.0500\t\t Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · 200 BURRARD STREET, Vancouver, BC V6C 3L6 · Vancouver, BC
No inspection records.