ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2023-01979

at Field Review - Addition / Alteration - #600 Interior alterations to provide improvements for a new School - University or College tenant at unit #600 on the 6th floor of this commercial building on the site. OK for Field Review as per R. Rattray on June 5, 2023 Tenant: Alexander College Letter of assurance provided by: Schedule A & B (Architectural): Kevin Hanvey, B.Arch, Architect AIBC, 604-632-3350 Schedule B (Structural) Wei Luo, P.Eng, 604-632-3350 Schedule B (Electrical): Ryan Blaney, P.Eng., 604-632-3350 Schedule B (Mechanical/Plumbing): Zhe Jia (Jack) Zhang, P.Eng., 604-632-3350 Note: - Building is sprinklered - Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during the inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. Revision #1: To add a mechanical unit on the roof, modify elevator surround millwork, change room 604 office to storage , and update drawings and schedules to match with changes Revision #2: Change of electrical Engineer from Alex Riftin, P.Eng., to Ryan Blaney P.Eng · 570 DUNSMUIR STREET, Vancouver, BC V6B 1Y1 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.