ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2022-05313

at Field Review - Addition / Alteration - 6th flr- #610, #620, #630, #640 and elevator lobby * SEE REVISION #1 *UNIT NO'S HAVE BEEN CANCELLED. #600 WILL REMAIN. Interior alterations to demise the existing full floor office on the 6th floor (#600) into four office shell units to be #610, #620, #630, #640 and provide improvements to the elevator lobby in this existing commercial building. Scope of work: remove all partition walls, finishes, lighting and millwork, and to construct demising walls, new lighting through out, elevator ceiling work, electrical, mechanical, plumbing and sprinkler work. REVISION #1 - REDUCE SCOPE OF WORK TO; DEMO AND CEILING TILES ONLY. Electrical, mechanical, & sprinklers to suit. *FLOOR WILL REMIAN AS SHELL. Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Michael D. McNaught, Architect AIBC, MRAIC, ph: 604-724-7602 Mechanical and Plumbing Schedule B, Eric Cresswell, P.Eng., ph: 604-684-5995 Electrical Schedule B, Roger Dupuis, P.Eng., LEED AP, ph: 604-569-6500 E2 - Lighting - Upgrade to Bilevel Lighting Control (per 9.4.1.1(d) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · 510 BURRARD STREET, Vancouver, BC V6C 3A8 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.