Passenger elevator
Unit kcmo-bp-2021-04912
at Field Review - Addition / Alteration - 6th floor - elevator lobby Interior alterations to the 6th floor to remove an elevator lobby door, frame and wall to this existing office shell space in this existing commercial building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · 1133 MELVILLE STREET, Vancouver, BC V6E 4E5 · Vancouver, BC
Specifications
- Type
- Passenger elevator
- Drive
- —
- Installed
- —
- Manufacturer
- —
- Model
- —
- Capacity
- —
- Speed
- —
- Stops
- —
- Rise
- —
- Fire service
- —
Inspection history
No inspection records.