at Field Review - Addition / Alteration - 11th Floor - (Elevator Lobby) Interior alterations only to provide improvements to the common elevator lobby on the 11th floor in this existing commercial building on site. Scope of work: Selective demo. New lobby finishes, lighting, flooring, new glass entry Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · 1066 W HASTINGS STREET, Vancouver, BC V6E 4M1 · Vancouver, BC
No inspection records.