at Field Review - Addition / Alteration - Main floor entrance and elevator lobby Interior alterations to provide improvements to the existing ground floor elevator lobby and side interior entrances in this existing commercial building. Scope to Include: Updates to the existing flooring, lighting, mechanical and HVAC. Building a new Storage space and front counter for the concierge staff Use. Square off existing void spaces. * Sprinkler Permit is required. Letters of Assurance submitted; Schedule A by Michael D. McNaught, Architect, AIBC, MRAIC. Ph#604.724.7602. -Structural Schedule B by Dennis Gam, P.Eng. Ph#604.838.0048 - Mechanical Schedule B by Recep Ahmet Ozata; P.Eng. Ph#604.684.5995. - Electrical Schedule B by Navtej Singh Bain’s, P.Eng. Ph#604.569.6500. OK For Field Review per A.Campbell & R.Rattray - Sept.28.2020 Energy Upgrade exemption: N/A (BOMA BESt (Path 1)) · 700 W GEORGIA STREET, Vancouver, BC V7Y 1K8 · Vancouver, BC
No inspection records.