at Certified Professional Program - New Building - Construction of a 40-storey building with commercial (ground level, level 3), office (levels 4-8),residential occupancies, 6 basement parking levels and the shell of the headhouse of the Granville Station. STAGED CONSTRUCTION, SHELL PERMIT Stage I: excavation/ shoring and foundation to grade including station head house. This stage excludes critical Rainwater Management systems. (issued Dec.10, 2020). Rev 2 (stage I structural revision): Structural revisions for general coordination and confirmation of 4 hr FRR for part of the structure. Stage I rev. #1: Structural revisions in the basement (issued May 17, 21) Stage II (full BP/ original building) issued Oct.4,21 Revision 2 includes changes per the approved DP-2021-00177. Revision#3: Changes to the full BP (changes to service and storage rooms in basement, Level 2 commercial lobby, and addition of shafts for future freight elevators) Revision #4: Per approved DP-2022-00383 : level 3 change of major occupancy from D to E. Stage III: Full building construction (issued March 14/23) Revision #4: Additional of dropped ceilings for services, in multiple locations. Minor interior wall niche at elevator machine room level to accommodate standpipe riser. Revision #5: recess in Stair #5 landing at level 2 to accommodate standpipe riser and HC. Revision #6: change of the mechanical/ plumbing/ fire suppression engineer of record. Revision#7: addition on exterior wall opening (L2, on south elevation) -issued April 24/2025 Revision #8: addition of garbage chute and the associated rooms (issued Aug 7/ 2025) · 2488 GRANVILLE STREET, Vancouver, BC · Vancouver, BC
No inspection records.