at Certified Professional Program - New Building - To construct mixed-use development comprised of: one 34-storey tower (Building 6) and one 24-storey tower (Building 7) containing a total of 469 Dwelling Units and one 34-storey tower (Building 8) containing 286 Dwelling Units; atop a podium containing Retail/Office Uses; all over three levels of underground parking, and a portion of the future 9-acre Park. STAGED CONSTRUCTION SHELL PERMIT Stage I (excavation/shoring) permit issued without the issuance of related development permit. (issued June 11, 2020) Stage 2 (foundation to grade) issued December 18,2020. Stage 2, revision 2 (full construction parkade) issued May 5, 2021 N.B.: revision #1 skipped Stage 3:construction of podium levels issued October 6, 21. Stage 3, Rev.#1: To update floor levels (structural drawings only) issued issued June 21/ 22 Stage 4: Full construction of level 6 and above of Buildings 6&7. Interior finishes for the following areas: office and residential lobbies at level 1; below-grade elevator lobbies; common areas on office levels 6&7; phase 1 south retail mall interiors. Change of Architect of record: As of March 31, 2023 Christopher Wegner is replacing William R. Bradley Revision #2: Revisions to base building shell within the future Food Store areas on Levels P2 and P1. Revision #3: Building permit revision to capture design changes during construction from level P3 to level 7 of the phase 1 south parkade and podium components. (issued July 4/ 2024) Revision #4:to capture design changes during construction for level 8 and above, including unit modifications and unit combinations. (issued Febr. 5/ 2025) Revision #5: To construct temporary stairs (issued Nov/20/2025) · 5931 CAMBIE STREET, Vancouver, BC · Vancouver, BC
No inspection records.