at Certified Professional Program - New Building - To construct mixed-use building comprised of one 32-storey tower (Building 3) and one 42-storey tower (Building 4) containing a total of 474 dwelling units; atop one podium containing Retail/Office Uses all over three levels of underground parking. (Phase I North) Shell permit. Stage I (excavation/shoring) permit issued without the related DP (August 19, 2019). Stage II (foundation and structure to grade) issued October 23, 2020. Revision I: Structural revisions to suite revised layouts and accommodate architectural, mechanical and electrical coordination. (issued 2/11/21) Revision II: Foundation structure to grade - construction of the area east of gridline C10 (previously excluded from Stage 2) (issued march 22, 21). Revision 3: full construction of parkade levels (issued April 23, 21) Stage III: podium levels full construction. Stage IV: Full construction for building 3 and building 4. Stage V: Interior finishes for lobbies, elevator lobbies and common areas on levels 2 to 6. Stage VI: Interior finishes for Retail areas on Levels P1 and P3. Change of Architect of record: As of March 31, 2023 Christopher Wegner is replacing William R. Bradley Revision #4: To capture design changes during construction from level P3 to level 6 of the Phase 1 North parkade and podium components (issued Febr 24/ 2025) Revision #5: to capture design changes during construction for level 7 and above, including unit modifications, unit combinations, added and deleted balconies, and deleted planters (issued May 12/ 2025) · 688 W 41ST AVENUE, Vancouver, BC V5Z 2M9 · Vancouver, BC
No inspection records.