at Certified Professional Program - New Building - To construct a new 4-storey (3-storey under Zoning & Development) industrial and commercial mixed use building consisting 2nd storey - manufacturing use (shell), 3rd & 4th storeys - office use (shell), all over 2 levels of parking (Level P1 (1st storey) and Level P2 below grade) via car elevator, having vehicular access from the lane. Separate tenant improvement permits are required for all shell tenant spaces. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Building to be sprinklered to NFPA 13 requirements. Related to DP-2017-01190, M/A DP-2019-00636 and M/A DP-2020-00571. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring - issued September 27, 2021 Stage 2 - Full Construction - issued April 26, 2022 Revision 1 - Interior alteration include changes to window sizes, updates to spatial separation calculations with respect to revised area of unprotected openings, changes to elevator machine room and storage room location, swing door within the loading bay overhead gate deleted, horizontal shaft in exit lobby added, changes to door schedules, structural shear wall changes, addition of partition walls, changes from chain link bike rooms to fire rated walls. Exterior alterations that include changing the composite decking to concrete tiles/pavers, proposing wood non-moveable planters, revising fence to metal guard around mechanical enclosure, removing sidewalk strips and exposed aggregate, to match M/A DP-2023-00128. - issued November 2, 2023 · 103 W 6TH AVENUE, Vancouver, BC V5Y 1K3 · Vancouver, BC
No inspection records.