ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2018-02735

at Certified Professional Program - New Building - To construct a mixed-use complex comprised of: 1. Building 1 - 22-storey tower containing Retail Stores on the ground and second floors, and 160 dwelling units on the 3rd through 22nd storeys; 2. Building 2 - 5-storey component containing a Child Day Care Facility and Neighbourhood House on the ground floor and 40 dwelling units on the 2nd through 5th storeys; 3. Building 3 - 14-storey component containing Retail Stores on the ground and second floors, and 133 dwelling units on the 3rd through 14th storeys; 4. Building 4 - 5-storey Multiple Dwelling building containing 30 dwelling units; all above 3 levels of underground parking accessed from Fraser Street, thereby providing a total of 363 dwelling units on this site. This permit has been issued for all site work and all below grade facilities for the proposed development. STAGED CONSTRUCTION Stage I (excavation/shoring) January 30, 2019. Stage II (foundation to grade) issued April 24, 2019. Revision 1 (revision to erosion and sediment control drawings) issued June 7, 2019. Stage 3 (full BP) issued July 26, 2019. Change of EoR (mechanical, plumbing and sprinkler): Taio Waldhaus replaced Kevin Shea as of Dec.15, 2020. Revision 3: to revise elevator/ exit stair vestibule layouts in levels P3, P2 and P1, to alter daycare space, and to include CRU demising walls on levels P1 and L1. · 8138 FRASER STREET, Vancouver, BC V1V 1V1 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.