at Certified Professional Program - New Building - The project will be a six-storey mixed-use building with at-grade commercial uses and 98 secured market rental housing units above the 1st storey, plus 2 levels of below grade parking. The project will be of non-combustible construction from below grade levels to level 2 slab and combustible construction above the level 2 slab. The building will be sprinklered throughout and will be provided with a monitored fire alarm system. ** This is a CP process Permit and the applicant is David Ho, CP ** Stage 1: Excavation & Shoring. June 25, 2019, B. Smith Stage 2: Foundation & Structure to ground level (originally submitted for Full Construction). Nov. 28, 2019, B. Smith Stage 3: Full Construction. March 23, 2020, B. Smith Revision #1 (Jan. 26, 2022): Change of Registered Professional of Record (Mech & Plumb) from Jean-Sebastien Tessier to Omar Al Milli, effective November 27, 2021. Revision #2 - (Sept. 22, 2022) 1) Relocate a parking space and relocate the cart return area to accommodate sanitary/storm connections and etc. 2) Elevator machine split and general building storage added. 3) CRU demising wall removed between CRU 2 & 3; future tenant space for TI. 4) Wall type revised at stair #8 mid landing to cast in place concrete. 5) Mechanical Review Notes: - Grease duct shafts proposed within all ground level CRUs (#1 - #6) through L2 - L6 to the roof. · 3838 RUPERT STREET, Vancouver, BC V5M 2Z3 · Vancouver, BC
No inspection records.