ElevatorAtlas
Passenger elevator

Unit kcmo-bp-2018-00718

at Field Review - Addition / Alteration - #2200-22nd floor (full floor) Interior alterations to provide tenant improvements for a new full-floor office tenant for a first TI of the 22nd floor of this existing highrise commercial building. Scope of work includes improvements to elevator lobby, corridors, restrooms, new partition walls, finishes, universal washroom, related mechanical, plumbing, electrical and sprinkler work. REVISION #1: To change the architect on record as of November 2, 2018 as per the letter submitted Feb. 15, 2019. New Schedule A and Architectural Schedule B submitted by Gus Spanos, AIBC. No change to ASHRAE. Feb. 27, 2019 mlh TENANT: unknown at this time (Reception on the 24th floor) Letters of Assurance submitted by: - Schedule A and Architectural Schedule B, H. Bruce Knapp, AIBC, 604.681.9913 - Structural Schedule B, Bob Neville, P.Eng, 604.738.0048 - Mechanical/Plumbing Schedule B, Brian Haugk, P.Eng, 206.448.3376 - Electrical Schedule B, Robert Olson, P.Eng, 206.448.3376 OK for FLD RVW per R. Rattray, May 16/2018. Note to DBI: no demising walls on any of floors 22-28 and there is no inter-connecting stairs on any of these floors. One tenant to occupy all 7 floors (reception on 24th)-confirmed with Architect/Applicant. Note: Only one set of drawings to be used for the following permits: BP-2018-02701 BP-2018-02703 BP-2018-02705 · 475 HOWE STREET, Vancouver, BC V6C 2B3 · Vancouver, BC

Specifications

Type
Passenger elevator
Drive
Installed
Manufacturer
Model
Capacity
Speed
Stops
Rise
Fire service

Inspection history

No inspection records.