6800 Wydown Blvd · Clayton, MO 63105
Owner: Fontbonne University- Physical Plant
10
Units
1962–2012
Years
9
Passenger
1
Other kinds
Equipment (10)
#1 Center
Passenger elevator · Hydraulic
1990 installed
2,100 lbs
3 stops
#1 East Bldg
Passenger elevator · Hydraulic
2000 installed
2,100 lbs
3 stops
AB Hall
Passenger elevator · Hydraulic
2010 installed
2,500 lbs
3 stops
DSAC Bldg
Passenger elevator · Hydraulic
1993 installed
2,500 lbs
3 stops
Fine Arts Bldg--SW Corner
Vertical platform lift
750 lbs
3 stops
Lobby
Passenger elevator · Hydraulic
1965 installed
2,000 lbs
3 stops
Lobby
Passenger elevator · Geared traction
2012 installed
2,000 lbs
4 stops
Main Hall East
Passenger elevator · Geared traction
1994 installed
2,000 lbs
4 stops
South Lobby
Passenger elevator · Geared traction
1962 installed
2,000 lbs
4 stops
SW Hall
Passenger elevator · Hydraulic
2000 installed
4,500 lbs
3 stops