High Density Housing / Commercial - Addition / Alteration - Interior alterations to replace existing single stage fire alarm panel with a new addressable single stage system and to provide modernization of the existing elevator to allow for elevator recall from P1 to 10th floor & penthouse of this existing multiple dwelling residential building for CSA-B44 upgrade. Scope of work: - Replace existing conventional FACP with new addressable single stage system and replace existing fire alarm annunciator to show automatic emergency elevator recall zones. - Upgrade electrical equipment for elevators in the machine rooms to suit new elevator power requirements. - Install new controllers, elevator machines, elevator cab interior finishes and operating fixtures. - Install new relays and upgrade existing FAS initiation devices to addressable type and to allow for activation of the automatic emergency elevator recall sequence. - Programming of Elevator Recall and FEO functions. Building Review Branch Notes: - Schedule B - Arch. submitted by E. M. Peterson, P. Eng. and James S. Emery, P. Eng. - Schedule B - Elec. submitted by A. J. Franklin, P. Eng. - Schedule A submitted by E. M. Peterson, P. Eng. - Automatic emergency recall (main - ground floor, alternate - bsmt floor)

5885 YEW STREET, Vancouver, BC V6M 3Y5 · Vancouver, BC

1
Units
Years
1
Passenger
0
Other kinds

Equipment (1)