Field Review - Addition / Alteration - 13th floor - elevator lobby and corridor Interior alterations to provide improvements to the existing elevator lobby and public corridors on the 13th floor of this existing Municipally designated Heritage 'A' commercial building. Scope of work: cosmetic upgrades including replacement of floor finish, wall finish, elevator door and frame finish, light fixtures, updated GWB ceiling and t-bar ceiling. Letters of Assurance submitted: - Schedule A and Architectural Schedule B by Vance Harris, Architect, AIBC. ph#604-255-1169. - Electrical Schedule by by Andrew Tashiro, P.Eng. ph#604-685-9381 - Structural Schedule B by Julia Halipchuk, BASc, P.Eng. ph#604-738- 0048. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
355 BURRARD STREET, Vancouver, BC V6C 0C5 · Vancouver, BC
2
Units
—
Years
2
Passenger
0
Other kinds