Field Review - Addition / Alteration - Exterior and interior alterations and a change of use from One Family Dwelling to an Office (Sales Center) for a limited period of time expiring May 18, 2023 (change to 1 year from date of issuance) to provide improvements for a new tenant on this site. Scope of work: - Demo interior walls & doors & plumbing fixtures, and stairs - Install mock up kitchen, bathrooms, living area and bedrooms - Install accessible elevator & washroom, stairs, reception area, plumbing fixtures & lighting - Relocate entrance &new stucco on South EL, new door & ramp for accessible on West EL, OK for Field Review per M.Smaldino Schedule A, B Structural & Geotechnical (permanent & temp) signed as per Michael Kondra, 604-542-0113, mkondra@shaw.ca Schedule B Mechanical & Plumbing signed as per Alex P.L. Lee, 604-324-8763, info@leesonengineering.com E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
2375 E 11TH AVENUE, Vancouver, BC V5N 5N4 · Vancouver, BC
1
Units
—
Years
1
Passenger
0
Other kinds