ElevatorAtlas

Field Review - Addition / Alteration - #406 and #408 (become #401) Interior demolition and combine the existing office unit #406 and #408 into one unit (#401) on the 4th floor of this existing commercial building. Scope of work: Remove the demising wall between the 2 suites and change it to suite #401. Demolish all existing partitions, doors/frames/hardware, millwork to shell. Some electrical and plumbing work. Revision #1: Changes to interior layout including new entrance and increased elevator lobby size, and new storage closet. Increase in project cost of $50,000. - May 6/25 - LLL Separate permit is required for future tenant improvement or to change the use. Schedule A and Architectural Schedule B submitted by Ken Wong, Architect, AIBC., 604.899.4549 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).

1148 HOMER STREET, Vancouver, BC V6B 2X6 · Vancouver, BC

1
Units
Years
1
Passenger
0
Other kinds

Equipment (1)