Field Review - Addition / Alteration - 6th floor - elevator lobby and common corridor Interior alterations to provide improvements to elevator lobby and common corridors to the 6th floor of this existing commercial building. Scope work: update flooring walls, finishes & lighting. Renovations to drywall ceiling by elevator doors to add height to space. Letters of Assurance: Schedule A by: Sadaf Alerassoul, Architect, AIBC. Ph#604.646.4581 Architectural Schedule B by: Sadaf Alerassoul, Architect, AIBC. Ph#604.646.4581 Electrical Schedule B by: S. S. Dhaliwal, P.Eng. ph#604-609-0500 x108 Mechanical Schedule B by;Ronald Braun, M.Sc., P.Eng. ph#604-609-0500 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
1050 W PENDER STREET, Vancouver, BC V6E 3S7 · Vancouver, BC
9
Units
—
Years
9
Passenger
0
Other kinds
Equipment (9)
kcmo-bp-2019-00790
Passenger elevator
kcmo-bp-2022-01998
Passenger elevator
kcmo-bp-2023-03429
Passenger elevator
kcmo-bp-2023-03456
Passenger elevator
kcmo-bp-2024-03391
Passenger elevator
kcmo-bp-2024-03403
Passenger elevator
kcmo-bp-2024-03424
Passenger elevator
kcmo-bp-2025-00181
Passenger elevator
kcmo-bp-2025-00189
Passenger elevator